翻訳と辞書
Words near each other
・ U.S. Route 220 in Virginia
・ U.S. Route 221
・ U.S. Route 221 in Florida
・ U.S. Route 221 in North Carolina
・ U.S. Route 221 in South Carolina
・ U.S. Route 221 in Virginia
・ U.S. Route 222
・ U.S. Route 222 Business (Reading, Pennsylvania)
・ U.S. Route 223
・ U.S. Route 224
・ U.S. Route 227
・ U.S. Route 23
・ U.S. Route 23 in Florida
・ U.S. Route 23 in Michigan
・ U.S. Route 23 in North Carolina
U.S. Route 23 in Ohio
・ U.S. Route 23 in Tennessee
・ U.S. Route 23 in Virginia
・ U.S. Route 231
・ U.S. Route 231 in Florida
・ U.S. Route 231 in Indiana
・ U.S. Route 24
・ U.S. Route 24 in Colorado
・ U.S. Route 24 in Illinois
・ U.S. Route 24 in Indiana
・ U.S. Route 24 in Michigan
・ U.S. Route 24 in Ohio
・ U.S. Route 240
・ U.S. Route 241
・ U.S. Route 25


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

U.S. Route 23 in Ohio : ウィキペディア英語版
U.S. Route 23 in Ohio

U.S. Route 23 (US 23) is a United States Numbered Highway that runs from Jacksonville, Florida, to Mackinaw City, Michigan. In the US state of Ohio, it is a major north–south state trunkline highway that runs from the Kentucky border at Portsmouth, Ohio to the Michigan border at Sylvania, Ohio.
==History==
Before the establishment of the United States Numbered Highways system in 1926, the route of what would eventually become US 23 was numbered as SR 4 from Portsmouth to Marion; SR 22 from Marion to Carey; SR 63 from Carey to Fostoria; SR 199 from Fostoria to Millbury; and SR 2 from Millbury to Toledo. Over the years, portions of US 23 have been realigned to divided highway, freeway, or expressway portions. Among these are a bypass of Circleville built in 1958; the Marion-to-Carey expressway routing, on which work began in 1962; and a bypass of Chillicothe, on which work began in 1966.
When first established, US 23 followed its current routing from Fostoria to Woodville, then continued north along present-day Fostoria Road into Millbury, and northwest along present-day Ohio State Route 51 (Woodville Road) into downtown Toledo. There, it followed Broadway Street, Starr Avenue, and Main Street to the Cherry Street Bridge (now the Martin Luther King Bridge) across the Maumee River. The route then followed Cherry Street (present-day SR 120) to Detroit Avenue (US 24), before turning west onto Laskey Road and north onto Lewis Avenue.〔 Only a year later, the Fostoria-to-Toledo routing was shifted westerly, taking a northwest-southeast route that was originally designated SR 63 between Fostoria and Perrysburg, then East River Road into Toledo. It crossed the Maumee River via the Fassett Street Bridge, then followed South, Sumner, Logan, Summit, and Huron streets to rejoin its original routing. The Fostoria-to-Millbury routing was designated SR 199, and the Millbury-to-Toledo routing became SR 102, which in turn became present-day SR 51 in 1955. By 1940, US 23 was shifted westerly again in Toledo, taking the Anthony Wayne Bridge to Summit Street, then to Jefferson Avenue and Collingwood Boulevard before rejoining the previous routing.
US 23 was realigned to follow Monroe Street northwesterly out of Toledo, joining with the first constructed segment of its current freeway routing in Sylvania. The freeway was extended southerly to US 20 (Central Avenue) by 1964. By 1969, the entire western freeway bypass of Toledo was complete, carrying the current routings of both US 23 and I-475. In addition, US 23 and SR 199 were swapped north of Fostoria in 1969, with US 23 reverting to its pre-1927 routing between Fostoria and Woodville, then becoming concurrent with US 20 from there to Perrysburg; the 1927-1969 routing of US-23 between Fostoria and Perrysburg thus became part of SR 199.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「U.S. Route 23 in Ohio」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.